Running tracks
USATF-certified polyurethane running tracks for Florida schools, universities and municipalities. Full GC service — subbase, drainage, surface and line marking. Licensed CBC1268683.

Track systems we install
Full-pour polyurethane or sandwich system — built to certify
Full-pour polyurethane delivers consistent energy return and spike resistance for competitive athletic use — the highest-performance, longest-lasting option. For school and municipal tracks, a sandwich system pairs a prefabricated rubber base with a polyurethane wear layer at a more economical price point.
Either way, all competitive track projects are designed and certified to USATF and IAAF dimensional and performance standards, with a complete documentation package delivered at handoff for sanctioned events.
Our process
From site to starting line
-
Site Survey & Engineering
We assess subbase conditions, drainage grades and site geometry to engineer a track that performs and drains properly for Florida's rainfall.
-
Permitting & Approvals
We manage all permits, school board or municipal approvals, and USATF compliance documentation.
-
Base & Surface Installation
Subbase grading, asphalt base course and surface installation executed by certified track crews.
-
Line Marking & Certification
USATF-compliant striping, final quality inspection and a complete documentation package delivered at handoff.

Funding the build
Frdap-eligible — we help you chase the money
Running tracks at public parks and schools are eligible for FRDAP funding, and we've helped Florida clients secure $450K+ in grant awards across programs. We assess eligibility, support the application, and build to grant compliance once funding lands.
Most school or municipal track projects run 8–14 weeks from contract to completion, and we schedule heavy construction around academic calendars.
Track questions
FL Certified Building Contractor — CBC1268683
What is the difference between full-pour and prefab track surfaces?
Full-pour polyurethane is applied liquid and cured in place — highest performance and longest lifespan. Prefabricated rubber rolls are more economical for schools and recreational use. We recommend the right system after reviewing your usage and budget.
Does your track meet USATF standards?
Yes. All competitive track projects we build are designed and certified to USATF standards. We provide full documentation for sanctioned events.
How long does a track project take?
Most school or municipal track projects take 8–14 weeks from contract to completion, depending on site conditions and permitting timeline.
Can we get FRDAP funding for a track?
Yes — running tracks at public parks and schools are eligible for FRDAP funding. We've helped Florida clients secure significant grant awards. Contact us to discuss eligibility.
Start your project
Tell us what you want to build
Fields, courts, tracks, greens — school district, municipality, university or backyard. We respond within two business days with next steps and a realistic number.
- Licensed FL Certified Building Contractor — CBC1268683
- 5-year warranty on materials and installation
- $450K+ in grant funding secured for clients
